Year: 2022-23

Company: Boehringer Ingelheim

Liaison(s): Dominique Monteil

This year’s BI TMP will focus on building the groundwork for a new plant model capable of simulating the Upstream and Downstream operations in the production facility at BI Fremont. The process simulation and model will use the Real-Time Modeling System software to complete this work. The Real-Time Modeling System allows the user to visualize the facility constraints, operational variability, and maximum production. At the completion of this work, the team will be able to simulate multiple scenarios that could lead to further increasing the facility output, thus enabling BI to bring more product to our patients.